Best modular house wholesale provider

Prefabricated house manufacturer 2024: Installation Efficiency – Flat-packed container house: The quick installation process ensures shorter construction times. A team of four workers can complete the installation of a single modular house in just 3 hours. Alternatively, the houses can be transported in full containers and connected to water and electricity on-site for immediate use. Light steel movable plank building: The installation process is time-consuming, taking 20-30 days, including pouring concrete foundations, constructing the main body, installing color steel plates, suspending the ceiling, and installing water and electricity. This method poses a high risk of operation and labor loss. Discover additional details at modular house supplier.

Container house is designed and developed according to the standard size of shipping container. It is of heatproof and waterproof. It is widely used as office, meeting room, dormitory, shop, booth, toilet, storage, kitchen, shower room and so on. Lida Flat Pack Container House is steel-frame structure, consisted with roofing frame, corner pillar and floor frame. All parts are prefabricated in factory and installed in site. Based on modular standard container house, container house can be grouped in horizontal and vertical. Flexible in layout and prefabricated to achieve different function purpose.

Container house is designed and developed according to the standard size of shipping container. It is of heatproof and waterproof. It is widely used as office, meeting room, dormitory, shop, booth, toilet, storage, kitchen, shower room and so on. Lida container houses include flat pack container house, foldable container house (folding container house), expandable container house, welding container house(customized container house)and modified shipping container house(converted shipping container house).

Lida mining labor camp (labour Camp) building is made of light steel as structure and sandwich panels for wall and roof. Insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass, which is determined by the demand and environment requirements. Lida mining labor camp (labour Camp) buildings can be assembled several times after one site construction finished, installed easily and cost effective.

The Lida Group Integrated Campsite Warehouse is an important part of the integrated camp. The camp warehouse is usually a separate building used to store all kinds of materials in the camp operation process. The size of the warehouse is individually tailored to the future operational needs of the camp contractor. The Lida Group’s comprehensive camp laundry room adopts a light steel structure skeleton and is maintained by composite plates or color steel. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. Read extra information at https://www.lidamodularhouse.com/.

Lida can provide large-scale farms and supporting facilities for customers. The chicken house is generally 6-15 meters wide and 30-100 meters long. The height of the flat coop is generally 2.2-2.4m, and the height of the high bed coop is about 5m. There are open type, windowed type and closed type in the chicken house, depending on the climate conditions. The exhibition hall is generally built with steel structure and glass curtain wall, simple and beautiful. This kind of structure is widely used in automobile exhibition hall and 4S shop.

Lida Group China is one of the famous container house supplier in China, who is responsible for the country’s key projects. Such as, the Olympic Sailing Center, bay bridge of Jiaozhou Gulf, Qingdao cross sea tunnel, etc. Lida Group prefab house manufacturer has the right of import and export, and its products have been exported to over 145countires, such as, the UAE, Saudi Arabia, Oman, Angola, Equatorial Guinea, Libya, France, Poland, Romania, Russia, Australia, the Philippines, Indonesia, etc.